New turnkey installation in France for one of the biggest bottling plants in Europe, of two high pressure HORIZON 3000 and one low pressure HORIZON 3000. With this installation, the whole high pressure and low pressure air demand is supplied to the plant and at the same time, ABC is taking the role of making the whole installation for necessary air pipelines and electrical connections in order to provide the blowers within air pressure.